環氧(yang)接地銅箔網絡概述(shu):
環氧自(zi)流平防(fang)靜(jing)(jing)電(dian)(dian)地(di)(di)面的(de)施(shi)工內(nei)(nei)容(rong)中,包含有銅箔構成的(de)網絡,這(zhe)些金(jin)屬網絡彼此形成電(dian)(dian)氣通路(lu),用于防(fang)靜(jing)(jing)電(dian)(dian)地(di)(di)面的(de)靜(jing)(jing)電(dian)(dian)傳導。作為(wei)電(dian)(dian)氣設計配合(he),應(ying)該將(jiang)防(fang)靜(jing)(jing)電(dian)(dian)地(di)(di)面所在的(de)建筑柱(zhu)上,適當預(yu)留接(jie)地(di)(di)端子(zi)盒。在地(di)(di)面施(shi)工完畢后,將(jiang)防(fang)靜(jing)(jing)電(dian)(dian)地(di)(di)面內(nei)(nei)的(de)金(jin)屬線與該接(jie)地(di)(di)端子(zi)盒相連。另外,該接(jie)地(di)(di)端子(zi)在土(tu)建施(shi)工過程中須通過柱(zhu)內(nei)(nei)主筋(jin)與接(jie)地(di)(di)極(ji)(ji)焊接(jie)連通,以(yi)使靜(jing)(jing)電(dian)(dian)通過接(jie)地(di)(di)端子(zi)沿柱(zhu)內(nei)(nei)主筋(jin)流向地(di)(di)極(ji)(ji)。防(fang)靜(jing)(jing)電(dian)(dian)接(jie)地(di)(di)電(dian)(dian)阻一(yi)般要求不大于10歐姆。
1、工(gong)藝流程
2、施工方法(fa)
清理地面(mian),尋找(zhao)中心線。首先將地面(mian)浮灰(hui)清除干(gan)凈,然后(hou)用量具找(zhao)出房間的中心位置,畫出中心十(shi)字線,要求(qiu)十(shi)字線垂直等分。
在地面(mian)底涂(tu)施(shi)(shi)(shi)工完成涂(tu)料(liao)(liao)充分干透(tou)后,進(jin)行(xing)二次打(da)磨(mo)處理并進(jin)行(xing)地面(mian)的(de)清潔維護,施(shi)(shi)(shi)工區域用警(jing)示帶等標示性的(de)材料(liao)(liao)進(jin)行(xing)隔離(li),以防止人員(yuan)誤闖(chuang)入施(shi)(shi)(shi)工區域。做好上述準備(bei)后就(jiu)可以進(jin)行(xing)導電膠(jiao)層的(de)施(shi)(shi)(shi)工,導電層施(shi)(shi)(shi)工利(li)用刮(gua)板進(jin)行(xing)涂(tu)裝作(zuo)業,要求導電層涂(tu)料(liao)(liao)厚度均勻。
鋪(pu)設(she)(she)銅(tong)(tong)箔(bo)網(wang)絡:在銅(tong)(tong)箔(bo)涂(tu)上少許(xu)導電膠(jiao),從中(zhong)心位(wei)置開始相(xiang)鄰鋪(pu)于地(di)面,縱向(xiang)2.4米到3.6米鋪(pu)設(she)(she)--根銅(tong)(tong)箔(bo)。銅(tong)(tong)箔(bo)必(bi)須有兩(liang)處以上沿墻壁(bi)用6平(ping)方(fang)的(de)軟(ruan)編(bian)織(zhi)帶引出約700mm,引出的(de)編(bian)織(zhi)帶與(yu)等電位(wei)端子(zi)箱相(xiang)連(lian),并選用PVC 線(xian)槽進行保護,等電位(wei)端子(zi)箱內(nei)裝40*4的(de)銅(tong)(tong)排,預留10個M8螺栓。
銅箔敷設完成后,進行中涂(tu)的施工,然后是面層,整個過程(cheng)按(an)序進行。